About Erhong

Built by one engineer who believed steel could carry the digital world

Erhong Metal Products designs and manufactures network cabinets from self-owned factories in Hebei Xianghe and Sichuan Deyang — over 50,000 square meters of automated production built, expansion by expansion, from a single workshop.

2004Founded
500,000+Units / Year
50+Countries Served
7Smart Factories
aerial view of Erhong network cabinet factory campus in Hebei Xianghe
Our production campus in Hebei Xianghe — the facility that grew out of a single workshop.

What Sets Us Apart

Four decisions we made early, and never stopped making

01

We studied the market before the metal

Years spent close to telecom and data center buyers taught us what a cabinet actually needs to survive in the field — not just what looks good in a catalog.

02

We hold the line on process

Every stage of production is measured against international standards, checked by a team that doesn’t treat “close enough” as a finished part.

03

We design around your application

Material selection and configuration start from your deployment conditions, not from a standard SKU we’re trying to move.

04

We keep building forward

From energy efficiency to environmental compliance, our product line moves with what the market will need next, not just what it needs today.

servo-controlled CNC bending center on the Erhong production floor
Servo-controlled bending — the kind of precision that doesn’t drift from order to order.

The Journey

From one workshop in Hebei to a name buyers trust across 50 countries

2004

A workshop, a belief, and a first order

Erhong started as a small precision sheet metal workshop in Hebei, built on a simple conviction: steel wasn’t just a material, it was the backbone the digital world would need. Our first real proof came from local telecom startups willing to let us prototype ruggedized server chassis alongside them — work that shaped the discipline we still build on today.

cold-rolled steel coil blanking line at Erhong factory
Raw coil to first press — where that discipline started.

2010

Earning a place inside China’s internet buildout

By 2010, our ISO-certified enclosures were running quietly behind a meaningful share of China’s early data center and 5G pilot infrastructure. We didn’t win that work with the lowest quote — we won it by showing up on spec, on schedule, order after order, until buyers stopped needing to double-check us.

factory workers assembling cabinet panels at Erhong production line
Assembly work from that era — the same hands-on standard we still hold today.

2016 – Present

Taking that same discipline global

Moving into international markets meant relearning our own standards for harsher conditions: IP66-rated cabinets built for Middle East desert deployments, modular low-energy designs for carbon-conscious European data centers. Today, seven smart factories and buyers in more than 50 countries later, the mission hasn’t changed — build the dependable foundation that lets someone else’s network, cloud, or city run without worrying about the box it sits in.

automated intelligent spray coating line with robotic arm at Erhong smart factory
Our automated spray line — part of the smart-factory upgrade that took Erhong global.

Proof, Not Promises

What trust looks like when a deadline is real

Case in Point

Helping a European data center infrastructure provider hit a 6-month deadline

A long-time European client needed to upgrade aging data centers for a major automotive client. Their existing cabinets were overheating, poorly cable-managed, and out of step with updated EU safety standards — with six months to fix it.

We supplied modular 18U/42U cabinets built for their exact specification: perforated doors and adjustable rails for improved airflow, CE and ISO 9001/14001-compliant materials, and a 30-day production turnaround on the first 200 units.

15%Lower Cooling Cost
ZeroInstall Downtime
20%Faster Deployment

“Erhong didn’t just sell us cabinets — they worked like an extension of our own engineering team. Their attention to IEC/EN standards was critical to getting this right.”

— Data Center Infrastructure Lead, European Client

rows of finished network cabinet frames staged for shipment at Erhong warehouse
Finished frames staged for shipment — the throughput behind our 500,000-unit annual capacity.

Want to know if we’re the right fit for your project?

Tell us your deployment conditions and spec, and we’ll tell you honestly whether we’re the right manufacturer for it.

Talk to Our Team
滚动至顶部

Ask For A Quick Quote

We will contact you within 1 hour, please pay attention to the email with the “tianhaojigui@outlook.com”.